Projects

Clients

Delivering Results Across The U.S.


Jon L.

"Great company that does quality work and cares for there employees."

Shane K.

"Wonderful pipeline inspection provider. I’d recommend them to anyone."

Madge S.

"An excellent group to work for. Some of the most knowledgeable people ever."

Trusted Partner

We Deliver Reliable Pipeline Inspections Across the U.S.

From Pennsylvania to Texas, NEFS delivers consistent, high-quality inspection services across diverse terrains and project scopes. No matter the location, our teams mobilize and execute with the same precision, reliability, and commitment to excellence our clients expect.

Jon L.

"Great company that does quality work and cares for their employees."

Project Map

Nationwide Results


Where We Have Worked

Where We Have Not Worked

Our Clients

Companies That Trust NEFS

Over the past decade, we have worked with some of the largest pipeline operators and midstream companies in the country. Here's who we have had the privilege of working with.

Air Products

Amp Americas

Buckeye

Duke Energy

Energy Transfer

Explorer

Goodnight Midstream

Kinder Morgan

Kinetik

Northwind

Summit Midstream

Targa Resources

Trace Midstream

West Texas Gas

Land Survey

Energy Transfer Partners

Energy Transfer Partners

  • View Information

    Project: ME1 Anode Bed Upgrades

    Location: Pennsylvania

    Dates: 2020 - 2023


    NEFS has worked closely with Duke in Kentucky and Ohio since early in 2018 on various projects along their distribution system including installations, change-outs, abandonments, tapping, replacements, etc.


    Project: BLAD to BUF 1 & 2 - Cathodic Protection Upgrades

    Location: Various Counties, New York

    Dates: 2020 - 2023


    Survey Support for new Anode Ground bed Installations - Two Phase sapnning over a three year period involving preliminary surveys, permit drawing production, landowenr exhibits, construction staking, IFC, IFA. IFC alignment sheets, as-built surveys, as-built deliverables


    Project: TWIN to NEWARK

    Location: Various Counties - Pennsylvania

    Dates: 2020 - 2023


    Anomaly Staking & Site Conditions Surveys - Site Reporting Production with Corresponding Exhibits for Contractor Bid/Pricing Review

Land Survey

Energy Transfer Partners

Kinder Morgan

  • View Information

    Location: Various Counties in TX

    Dates: 2023-2025


    Ground Bed Survey Support  – preliminary surveys, as-built surveys, signed and sealed exhibits

Land Survey

Energy Transfer Partners

Douglas Pipeline

  • View Information

    Project: Valley View Pipeline - 4.4 Miles

    Location: Trimble County, KY

    Dates: 2024


    RNG Pipeline - preliminary survey, property exhibits, IFC alignment sheets


    Project: Beech Hollow Pipeline - 2.4 Miles

    Location: Jackson County, OH

    Dates: 2023 - 2024


    RNG Pipeline - preliminary survey, property exhibits, IFC alignment sheets


    Project: Sycamore Ridge Pipeline - 3.5 Miles

    Location: Vigo County, IN

    Dates: 2024


    RNG Pipeline - preliminary survey, property exhibits, IFC alignment sheets


    Project: Lightning Renewables Pipeline - 12.8 Miles

    Location: Jackson County, IL

    Dates: 2024 - 2025


    RNG Pipeline - preliminary survey, property exhibits, IFC alignment sheets, As-built alignment sheets


    Project: Hyland Facility Pipeline - 2.2 Miles

    Location: Allegany County, NY

    Dates: 2025


    RNG Pipeline - preliminary survey, as-built survey, property exhibits, IFC alignment sheets, As-built alignment sheets


    Project: Kearney Pipeline - 5.5 Miles

    Location: Kearney County, NE

    Dates: 2026


    RNG Pipeline - preliminary survey, property exhibits, IFC alignment sheets

NDE/Integrity

Energy Transfer Partners

Energy Transfer

  • View Information

    Dates: 2024–Present


    NETS provides pipeline integrity support across multiple operating regions in support of ILI verification dig programs. Responsibilities included anomaly verification, coordination with client representatives, welding and coating inspection, and NDE support during excavation and repair activities. The team supports hundreds of anomaly investigations annually, performing wall loss evaluations, corrosion assessments, repair verification, and detailed documentation of field conditions. Work includes evaluating anomalies identified through in-line inspection tools and supporting the full lifecycle of integrity digs, from initial site verification and anomaly assessment through repair documentation and final site restoration.

AGM Survey/Tool Tracking

Energy Transfer Partners

Kinder Morgan

  • View Information

    Project: AGM Survey & Tool Tracking

    Dates: 2025


    NETS completed a 217 mile Above Ground Marker (AGM) Survey and Tool Tracking project for Kinder Morgan. Our team delivered full survey coverage with 100% accuracy, directly contributing to a smooth and successful tool run. Challenging terrain along the route did not impact our productivity or safety, and our field technicians maintained consistent performance throughout the project. NETS staffed the job efficiently with experienced personnel, ensuring reliable execution from start to finish.

Construction Inspection

Energy Transfer Partners

Multiple Major Operators

  • View Information

    Dates: 2024


    NEFS has worked for major operators in the oil, gas, and renewables sectors of the energy industry in the past 12+ years on both large and small projects including integrity, transmission, gathering, compression, production, distribution, methane capture, etc. in over 40 states nationwide.


    Operators include Duke Energy, Kinder Morgan, Energy Transfer, Kinetik, West Texas Gas, Trace Midstream, Explorer Pipeline, Buckeye Pipeline Partners, Goodnight Midstream, Targa Resources, and Amp Americas.

Projects

Land Survey

Certified. Accredited. Trusted.

  • Energy Transfer Partners

    Project: ME1 Anode Bed Upgrades

    Location: Pennsylvania

    Dates: 2020 - 2023


    NEFS has worked closely with Duke in Kentucky and Ohio since early in 2018 on various projects along their distribution system including installations, change-outs, abandonments, tapping, replacements, etc.


    Project: BLAD to BUF 1 & 2 - Cathodic Protection Upgrades

    Location: Various Counties, New York

    Dates: 2020 - 2023


    Survey Support for new Anode Ground bed Installations - Two Phase sapnning over a three year period involving preliminary surveys, permit drawing production, landowenr exhibits, construction staking, IFC, IFA. IFC alignment sheets, as-built surveys, as-built deliverables


    Project: TWIN to NEWARK

    Location: Various Counties - Pennsylvania

    Dates: 2020 - 2023


    Anomaly Staking & Site Conditions Surveys - Site Reporting Production with Corresponding Exhibits for Contractor Bid/Pricing Review


  • Kinder Morgan

    Location: Various Counties in TX

    Dates: 2023-2025


    Ground Bed Survey Support  – preliminary surveys, as-built surveys, signed and sealed exhibits

  • Douglas Pipeline

    Project: Valley View Pipeline - 4.4 Miles

    Location: Trimble County, KY

    Dates: 2024


    RNG Pipeline - preliminary survey, property exhibits, IFC alignment sheets


    Project: Beech Hollow Pipeline - 2.4 Miles

    Location: Jackson County, OH

    Dates: 2023 - 2024


    RNG Pipeline - preliminary survey, property exhibits, IFC alignment sheets


    Project: Sycamore Ridge Pipeline - 3.5 Miles

    Location: Vigo County, IN

    Dates: 2024


    RNG Pipeline - preliminary survey, property exhibits, IFC alignment sheets


    Project: Lightning Renewables Pipeline - 12.8 Miles

    Location: Jackson County, IL

    Dates: 2024 - 2025


    RNG Pipeline - preliminary survey, property exhibits, IFC alignment sheets, As-built alignment sheets


    Project: Hyland Facility Pipeline - 2.2 Miles

    Location: Allegany County, NY

    Dates: 2025


    RNG Pipeline - preliminary survey, as-built survey, property exhibits, IFC alignment sheets, As-built alignment sheets


    Project: Kearney Pipeline - 5.5 Miles

    Location: Kearney County, NE

    Dates: 2026


    RNG Pipeline - preliminary survey, property exhibits, IFC alignment sheets

Projects

Land Survey

  • Energy Transfer Partners

    Project: ME1 Anode Bed Upgrades

    Location: Pennsylvania

    Dates: 2020 - 2023


    NEFS has worked closely with Duke in Kentucky and Ohio since early in 2018 on various projects along their distribution system including installations, change-outs, abandonments, tapping, replacements, etc.


    Project: BLAD to BUF 1 & 2 - Cathodic Protection Upgrades

    Location: Various Counties, New York

    Dates: 2020 - 2023


    Survey Support for new Anode Ground bed Installations - Two Phase sapnning over a three year period involving preliminary surveys, permit drawing production, landowenr exhibits, construction staking, IFC, IFA. IFC alignment sheets, as-built surveys, as-built deliverables


    Project: TWIN to NEWARK

    Location: Various Counties - Pennsylvania

    Dates: 2020 - 2023


    Anomaly Staking & Site Conditions Surveys - Site Reporting Production with Corresponding Exhibits for Contractor Bid/Pricing Review


  • Kinder Morgan

    Location: Various Counties in TX

    Dates: 2023-2025


    Ground Bed Survey Support  – preliminary surveys, as-built surveys, signed and sealed exhibits

  • Douglas Pipeline

    Project: Valley View Pipeline - 4.4 Miles

    Location: Trimble County, KY

    Dates: 2024


    RNG Pipeline - preliminary survey, property exhibits, IFC alignment sheets


    Project: Beech Hollow Pipeline - 2.4 Miles

    Location: Jackson County, OH

    Dates: 2023 - 2024


    RNG Pipeline - preliminary survey, property exhibits, IFC alignment sheets


    Project: Sycamore Ridge Pipeline - 3.5 Miles

    Location: Vigo County, IN

    Dates: 2024


    RNG Pipeline - preliminary survey, property exhibits, IFC alignment sheets


    Project: Lightning Renewables Pipeline - 12.8 Miles

    Location: Jackson County, IL

    Dates: 2024 - 2025


    RNG Pipeline - preliminary survey, property exhibits, IFC alignment sheets, As-built alignment sheets


    Project: Hyland Facility Pipeline - 2.2 Miles

    Location: Allegany County, NY

    Dates: 2025


    RNG Pipeline - preliminary survey, as-built survey, property exhibits, IFC alignment sheets, As-built alignment sheets


    Project: Kearney Pipeline - 5.5 Miles

    Location: Kearney County, NE

    Dates: 2026


    RNG Pipeline - preliminary survey, property exhibits, IFC alignment sheets

Projects

Land Survey

  • Energy Transfer Partners

    Project: ME1 Anode Bed Upgrades

    Location: Pennsylvania

    Dates: 2020 - 2023


    NEFS has worked closely with Duke in Kentucky and Ohio since early in 2018 on various projects along their distribution system including installations, change-outs, abandonments, tapping, replacements, etc.


    Project: BLAD to BUF 1 & 2 - Cathodic Protection Upgrades

    Location: Various Counties, New York

    Dates: 2020 - 2023


    Survey Support for new Anode Ground bed Installations - Two Phase sapnning over a three year period involving preliminary surveys, permit drawing production, landowenr exhibits, construction staking, IFC, IFA. IFC alignment sheets, as-built surveys, as-built deliverables


    Project: TWIN to NEWARK

    Location: Various Counties - Pennsylvania

    Dates: 2020 - 2023


    Anomaly Staking & Site Conditions Surveys - Site Reporting Production with Corresponding Exhibits for Contractor Bid/Pricing Review


  • Kinder Morgan

    Location: Various Counties in TX

    Dates: 2023-2025


    Ground Bed Survey Support  – preliminary surveys, as-built surveys, signed and sealed exhibits

  • Douglas Pipeline

    Project: Valley View Pipeline - 4.4 Miles

    Location: Trimble County, KY

    Dates: 2024


    RNG Pipeline - preliminary survey, property exhibits, IFC alignment sheets


    Project: Beech Hollow Pipeline - 2.4 Miles

    Location: Jackson County, OH

    Dates: 2023 - 2024


    RNG Pipeline - preliminary survey, property exhibits, IFC alignment sheets


    Project: Sycamore Ridge Pipeline - 3.5 Miles

    Location: Vigo County, IN

    Dates: 2024


    RNG Pipeline - preliminary survey, property exhibits, IFC alignment sheets


    Project: Lightning Renewables Pipeline - 12.8 Miles

    Location: Jackson County, IL

    Dates: 2024 - 2025


    RNG Pipeline - preliminary survey, property exhibits, IFC alignment sheets, As-built alignment sheets


    Project: Hyland Facility Pipeline - 2.2 Miles

    Location: Allegany County, NY

    Dates: 2025


    RNG Pipeline - preliminary survey, as-built survey, property exhibits, IFC alignment sheets, As-built alignment sheets


    Project: Kearney Pipeline - 5.5 Miles

    Location: Kearney County, NE

    Dates: 2026


    RNG Pipeline - preliminary survey, property exhibits, IFC alignment sheets

Projects

Land Survey

  • Kinder Morgan

    Project: Gulf Coast Express

    Dates: 2018-Present


    NEFS was awarded work on Kinder Morgan’s GCX in 2018. GCX a joint venture between subsidiaries/affiliates of Kinder Morgan, DCP Midstream and Targa Resources Corp., is building the Gulf Coast Express Pipeline Project (GCX Project) to bring natural gas from West Texas to the Gulf Coast. The GCX Mainline portion of the project will consist of approximately 447.5 miles of 42-inch pipeline with associated compression all originating at the Waha Hub near Coyanosa, Texas in the Permian Basin, and terminating near Agua Dulce, Texas near the Gulf Coast. The GCX Midland Lateral portion of the project will consist of approximately 50 miles of 36-inch pipeline and associated compression to transport natural gas processed at facilities owned by Targa, as well as facilities owned jointly by Targa and Pioneer Natural Resources (Pioneer), and provide a connection with the proposed GCX Mainline.


    Project: Gas Projects & Vendor Surveillance

    Dates: (2015-Present)


    NEFS continues to provide inspection services on various Kinder Morgan Gas Projects throughout their system. These projects include, but are not limited to: interconnects, cross country pipelines, class changes, compressor stations, meter stations, line replacements and hydrotests. In addition, NEFS has been responsible for Kinder Morgan’s Vendor Surveillance and Quality Assurance of equipment being built for the Broadrun Expansion Project and other projects.

  • Duke Energy

    Project: Ohio Operations

    Dates: 2018-Present


    NEFS has worked closely with Duke in Kentucky and Ohio since early in 2018 on various projects along their distribution system including installations, change-outs, abandonments, tapping, replacements, etc.


    Project: Line 427 – Phase II

    Dates: (2018-2019)


    NEFS was awarded work on this project in 2018 which includes 20.5 miles of 16-inch with (7) HDDs, (2) launcher/receivers, (8) regulator stations, (1) meter station, etc. It also includes abandonment of 11 miles of 12-inch (Line 248), and 10 miles of 12-inch (Line 60) near Rocky Mount, NC.


    Project: 7 MLV Natural Gas Services

    Dates: (2014-Present)


    Working through our associated company, NEES, we are providing observation services of Duke Company & Duke Contractor Crews as they perform various; installations, change-outs, abandonments, tapping, and replacements on their distribution systems located in northern Kentucky and southern Ohio. stations – rebuilt 5 and built 2 new MLV stations with launcher and reliever traps.

  • Equitrans Midstream

    Project: Mountain Valley Pipeline (MVP)

    Dates: 2017-Present


    NEFS is continuing to provide construction inspection on this 300+ mile, 42-inch project from northwestern West Virginia to southern Virginia. In addition, the project requires three compressor stations with locations identified as Wetzel, Braxton, and Fayette counties of West Virginia. NEFS has placed inspectors on all nine spreads of this project which should be complete by the close of 2019.

  • Eagle Claw Midstream

    Dates: 2017-Present


    NEFS has provided construction inspection and been an integral part of Eagle Claw’s crude oil and natural gas gathering and processing expansion in the Delaware Basin the past couple of years.

  • Energy Transfer Company

    Project: Wellsboro

    Dates: 2017-Present


    NEFS began providing inspection services on the 19 miles of 24″ Pipeline from the Lovell Station to the proposed K.M. Dunkleberger Meter & Control Station in Tioga County, PA in June. The project includes the installation of a measurement facility that will be called the K.M. Dunkleberger Meter & Control Station (275 mmcf/day w/expansion up to 500 mmcf/day).

  • CP Energy

    Project: Omega Tank Battery

    Dates: 2017-Present


    NEFS began providing inspection services on the Omega Tank Battery project in May, 2017 near Edmund, Oklahoma. This project consists of a storage tank, trunkline and related interconnects.

  • Columbia Pipeline Group

    Project: Leach Express

    Dates: 2016-2017


    NEFS provided inspection services on Spreads I and II of the Leach Express Project in Ohio. Transcanada purchased Columbia Pipeline Group early in the project and eventually took the project over in February, 2017.

  • Wolverine Pipe Line Company

    Project: Detroit Metro Access

    Dates: 2016-Present


    NEFS continues to provide inspection services for the Detroit Metro Access Project. The project consists of 34 miles of 16” pipeline for finished petroleum products and associated facilities in Washtenaw and Wayne Counties, Michigan.

  • Buckeye Pipeline Partners

    Dates: 2015-Present


    NEFS has been working with Buckeye Pipeline Partners for several years expanding their terminals, pipelines and related facilities in south Texas, Ohio, and multiple states in the Midwest.

  • Harvest Pipeline

    Project: Y Pennant

    Dates: 2014


    NEFS provided inspection services for the Y Pennant Project. This project consisted of new construction for 38 miles of 16” pipeline from Mahoning County to Columbiana County in Ohio. This project included multiple HDD and bores.

  • NET Midstream

    Project: NET Mexico

    Dates: 2014-2015


    NEFS has been involved with this project since March, 2014. The project consists of constructing a 42” pipeline from a 50,000 HP compressor station, 7 meter stations and 30” & 36” headers at Agua Dulce Texas to Rio Grande City with a 48” river crossing; approximately 140 miles.

  • Sunoco Logistics

    Project: Mariner & MOPI Rehab

    Dates: 2013-Present


    Mariner West Replacement: 8” take up and relay; 9 miles in Rochester hills, MI; Worked on existing 40’ ROW through neighborhood setting; 8 HDD’s – ranging from 400’ to 6000’; 2 MLV stations and 1 meter station.


    Mariner East 1: 8” Anomaly digs consisting of pipe replacement; 300 miles from Delmont, PA to Philadelphia, PA; Worked on existing 40-50’ ROW; 23 HDD’s – ranging from 600’ to 5000’; 36 MLV stations – rebuilt 24 and built 12 new


    MOPI Rehab: 12” anomaly digs consisting of pipe replacement; 30 miles from Glen Riddle, PA to Sinking Springs, PA; Worked on existing 40-50’ ROW


    Project: Allegheny Access

    Dates: 2013-2014


    NEFS has been working as a subcontractor to STV Energy, Inc. on this project since December, 2013 supplying Construction Inspection services. This project consists of 160 miles of 12” pipeline from Ohio to western Pennsylvania.


    Project: Integrity (Ongoing)

    Dates: 2011-Present


    NEFS has worked with Sunoco for the past several years supplying Construction Inspection services to their Integrity program in Michigan, Ohio and Pennsylvania.

  • STV

    Project: Paulsboro Natural Gas Pipeline, Delaware River Crossing


    The entire pipeline will be approximately 2.6 miles in total length. The Delaware River crossing will be completed with an intercept horizontal directional drill (HDD). From the HDD tie-in in Pennsylvania, the 24-inch pipeline will be trenched approximately 3,600 feet north to the existing PNGPC / Spectra Meter Site. Within the refinery property in New Jersey, the HDD carrier will be tied into the PRC Tie-In site. From the PRC Tie-In site, there is approximately 1,600 feet of trenched 12-inch, mostly within the refinery’s Marine Gate Road, to the existing refinery piping. The project is located in Tinicum Township, Delaware County, Pennsylvania and the Borough of Paulsboro and Greenwich Township, Gloucester County, New Jersey.

Connect

Let's Get to Work